Nursing home survey-readiness checklist
A free printable checklist for nursing home administrators and DONs: open corrections, staff records, QAPI, evidence and follow-up responsibilities.
Guides
We explain federal nursing home requirements with links to CMS and other primary sources. Each guide shows its update date and the sources checked. State licensing and assisted living rules need a separate review.
Start with the job in front of you
Read the finding, organize the correction and understand the response process.
Reconcile quarterly staffing records, then understand how CMS uses the results.
Connect improvement work with the evidence behind recurring areas of risk.
The Plan of Correction and PBJ guides include free printable working aids. Use them in your own records; no sign-up is needed.
A free printable checklist for nursing home administrators and DONs: open corrections, staff records, QAPI, evidence and follow-up responsibilities.
Build a nursing home Plan of Correction with the five CMS elements, a free working worksheet, review steps and answers about deadlines and acceptance.
Read the tags, scope and severity, findings and response instructions on your CMS-2567 before drafting a Plan of Correction.
Separate immediate protective action, removal-plan acceptance, onsite verification and the correction process after nursing home IJ.
The A–L grid, substantial compliance, substandard quality of care and the limits of scope-and-severity disputes.
Review per-day and per-instance penalties, hearing deadlines, waiver reductions and the separate IDR and IIDR processes.
What IDR can challenge, when IIDR is offered, filing deadlines and why neither process replaces a timely formal appeal.
Current CMS SFF selection, survey frequency, graduation criteria and Care Compare treatment for active participants.
PBJ reporting deadlines, iQIES submission, eligible staffing hours and a free printable reconciliation checklist for nursing homes.
The July 2026 CMS methodology: two standard inspections, staffing and quality measures, overall rating adjustments and SFF exceptions.
The five QAPI elements, required committee membership, meeting frequency, annual improvement projects and the F865–F868 tags.
Review the assessment, supervision and environmental findings behind an F689 citation, then connect correction to verifiable practice.
Check the IPCP, infection preventionist role, related F-tags, surveillance and reporting responsibilities after an infection-control citation.
These guides cover the same ground Wardwell automates: reading CMS-2567s, drafting PoCs, tracking staff certifications, watching for state-survey patterns. The 30-day pilot takes no card.